After dropping off the Torae-assisted “The Trade” and “Life & Death,” the Ontario duo First Division give DJ Booth the green light to premiere their new EP, The Critical Path Pt. 1. The EP features five production spots from Marco with his signature boom-bap and is definitely worth the bandwidth.
Albums
First Division – The Critical Path pt.1
-
Albums
Mozzy Drops ‘Children of the Slums’ Album
With features from Fridayy, Celly Ru, E Mozzy, and Eric Bellinger.
-
-
Albums
Mez Drops ‘The Loading’ EP
With features from Leon Bridges, Isaiah Rashad, MAVI, SAINt JHN, Childish Major, & more.
-
-
-
-
-
Playlists
Shakedeck: Soundtrack Slaps
Rare songs, forgotten gems, and classic hits from movie soundtracks over the years.
-
Videos
DJ Premier & Snoop Dogg Share “Can U Dig That?” Video
The first collabo under Premier’s new independent imprint, TTT.
-
Playlists
Weekly Dope: Future + Metro Boomin, PartyNextDoor, Tinashe & More
A collection of our favorite songs of the week.
-
Songs
Your Old Droog, Method Man, & Denzel Curry Connect For “DBZ” Single, Produced By Madlib
YOD will drop an album in 2024.
-